IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,539

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0303 # 12 Y:1987 12 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $174,746 $36,800 Implemented
TN0303 # 13 Y:1987 13 1987 HEAT WATER WITH EXHAUST HEAT $15,719 $26,500 Implemented
UD0227 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,035 $30,000 Implemented
UD0227 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $4,712 $12,000 Implemented
UD0227 # 04 Y:1987 04 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $534 $6,000 Implemented
UD0228 # 01 Y:1987 01 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,352 $13,000 Implemented
UD0228 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $50 Implemented
UD0229 # 01 Y:1987 01 1987 REDESIGN PROCESS $3,516 $0 Implemented
UD0229 # 02 Y:1987 02 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $7,735 $2,000 Implemented
UD0229 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,624 $6,000 Implemented
UD0229 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,125 $935 Implemented
UD0229 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,776 $20,400 Implemented
MA0083 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,912 $12,250 Implemented
MA0083 # 02 Y:1987 02 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $219 $132 Implemented
MA0083 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $1,084 $1,890 Implemented
MA0083 # 04 Y:1987 04 1987 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $21,576 $62,000 Implemented
MA0084 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $713 $100 Implemented
MA0084 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $2,610 $2,538 Implemented
MA0084 # 04 Y:1987 04 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,150 $34,500 Implemented
MA0084 # 06 Y:1987 06 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $578 $200 Implemented
KU0216 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,533 $20,000 Implemented
KU0216 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $2,429 $683 Implemented
KU0216 # 05 Y:1987 05 1987 IMPROVE LUBRICATION PRACTICES $2,386 $2,250 Implemented
KU0216 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,562 $0 Implemented
OK0216 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $4,180 $2,250 Implemented