Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,780
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0212 # 01 Y:1987 | 01 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,241 | $1,000 | Implemented |
ST0064 # 01 Y:1986 | 01 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,167 | $0 | Implemented |
ST0064 # 06 Y:1986 | 06 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $12,081 | $0 | Implemented |
ST0064 # 07 Y:1986 | 07 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,137 | $5,000 | Implemented |
ST0064 # 08 Y:1986 | 08 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $526 | $627 | Implemented |
ST0064 # 10 Y:1986 | 10 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $6,774 | $2,100 | Implemented |
ST0065 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,024 | $0 | Implemented |
ST0065 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,556 | $0 | Implemented |
ST0065 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,589 | $537 | Implemented |
ST0065 # 05 Y:1986 | 05 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $337 | $1,167 | Implemented |
ST0065 # 06 Y:1986 | 06 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $787 | $1,775 | Implemented |
ST0066 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,389 | $1,400 | Implemented |
ST0066 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $0 | Implemented |
ST0066 # 03 Y:1986 | 03 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $100 | Implemented |
ST0066 # 06 Y:1986 | 06 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,041 | $0 | Implemented |
ST0066 # 07 Y:1986 | 07 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $5,537 | $1,000 | Implemented |
ST0066 # 10 Y:1986 | 10 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $413 | $0 | Implemented |
ST0067 # 01 Y:1986 | 01 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,304 | $0 | Implemented |
ST0067 # 03 Y:1986 | 03 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,202 | $30,000 | Implemented |
ST0067 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,288 | $537 | Implemented |
ST0067 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,828 | $0 | Implemented |
ST0067 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $767 | $228 | Implemented |
ST0067 # 08 Y:1986 | 08 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $882 | $10,000 | Implemented |
ST0068 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,163 | $300 | Implemented |
ST0068 # 02 Y:1986 | 02 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $246 | $0 | Implemented |