IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,780

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0265 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,474 $7,430 Implemented
TN0265 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $896 $115 Implemented
TN0265 # 07 Y:1985 07 1985 INSTALL SET-BACK TIMERS $498 $0 Implemented
TN0266 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,445 $600 Implemented
TN0266 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,958 $375 Implemented
TN0266 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,054 $0 Implemented
TN0266 # 06 Y:1985 06 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $948 $2,300 Implemented
TN0266 # 08 Y:1985 08 1985 INSTALL SET-BACK TIMERS $618 $0 Implemented
TN0267 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,967 $0 Implemented
TN0267 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $5,424 $2,400 Implemented
TN0267 # 03 Y:1985 03 1985 REPAIR AND ELIMINATE STEAM LEAKS $4,358 $87 Implemented
TN0267 # 04 Y:1985 04 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,910 $614 Implemented
TN0257 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,048 $450 Implemented
TN0260 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,755 $0 Implemented
TN0262 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,702 $0 Implemented
TN0262 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44 $0 Implemented
ST0034 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,160 $80 Implemented
ST0034 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $330 $0 Implemented
ST0034 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $575 $1,200 Implemented
ST0034 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $150 $0 Implemented
ST0035 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,841 $13,140 Implemented
ST0035 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,014 $240 Implemented
ST0035 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $106 $0 Implemented
ST0035 # 14 Y:1985 14 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,586 $3,500 Implemented
ST0036 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,064 $56 Implemented