Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,772
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0017 # 03 Y:1985 | 03 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $302 | $46 | Implemented |
ST0017 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $13,133 | $1,900 | Implemented |
ST0017 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,200 | $104 | Implemented |
ST0017 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $1,765 | $1,800 | Implemented |
ST0017 # 08 Y:1985 | 08 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,755 | $1,900 | Implemented |
ST0017 # 09 Y:1985 | 09 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $605 | $0 | Implemented |
ST0017 # 10 Y:1985 | 10 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,307 | $1,400 | Implemented |
ST0017 # 11 Y:1985 | 11 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $439 | $497 | Implemented |
ST0018 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $679 | $0 | Implemented |
ST0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,502 | $453 | Implemented |
ST0018 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,390 | $1,900 | Implemented |
ST0018 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,356 | $128 | Implemented |
ST0018 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,038 | $537 | Implemented |
ST0018 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $599 | $1,263 | Implemented |
ST0019 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,367 | $1,116 | Implemented |
ST0019 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,428 | $56 | Implemented |
ST0019 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $691 | $300 | Implemented |
ST0019 # 05 Y:1985 | 05 | 1985 | USE OPTIMUM THICKNESS INSULATION | $541 | $240 | Implemented |
ST0019 # 06 Y:1985 | 06 | 1985 | TURN OFF EQUIPMENT WHEN NOT IN USE | $666 | $150 | Implemented |
ST0019 # 08 Y:1985 | 08 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,350 | $0 | Implemented |
ST0019 # 09 Y:1985 | 09 | 1985 | USE COMPRESSOR AIR FILTERS | $148 | $40 | Implemented |
ST0019 # 10 Y:1985 | 10 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $274 | $500 | Implemented |
ST0019 # 11 Y:1985 | 11 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $906 | $175 | Implemented |
ST0019 # 12 Y:1985 | 12 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,567 | $1,900 | Implemented |
ST0019 # 13 Y:1985 | 13 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,654 | $537 | Implemented |