IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,772

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0016 # 02 Y:1985 02 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $547 $309 Implemented
LT0017 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,540 $150 Implemented
LT0017 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $13,000 Implemented
LT0017 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,190 $10,000 Implemented
LT0018 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,397 $59 Implemented
LT0018 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $46 $75 Implemented
LT0018 # 04 Y:1985 04 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $458 $81 Implemented
LT0020 # 01 Y:1985 01 1985 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $29,200 $18,740 Implemented
LT0020 # 03 Y:1985 03 1985 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,460 $1,150 Implemented
LT0016 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,887 $2,485 Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0152 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $99 Implemented
UD0148 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,500 $300 Implemented
UD0148 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,111 $2,395 Implemented
UD0149 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,221 $2,000 Implemented
UD0149 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,360 $0 Implemented
UD0149 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $276 Implemented
UD0149 # 04 Y:1985 04 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $332 $300 Implemented
UD0150 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,440 $0 Implemented
UD0150 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $646 $140 Implemented
UD0150 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $702 $3,000 Implemented
UD0150 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,218 $1,360 Implemented
OK0156 # 02 Y:1985 02 1985 OPTIMIZE PLANT POWER FACTOR $5,639 $7,640 Implemented
OK0156 # 04 Y:1985 04 1985 RECOVER AND REUSE COOLING WATER $1,387 $500 Implemented
OK0156 # 05 Y:1985 05 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,307 $624 Implemented