IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,765

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0220 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $6,330 $400 Implemented
TN0220 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $680 $250 Implemented
TN0220 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $226 $0 Implemented
TN0212 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,487 $400 Implemented
TN0212 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,547 $500 Implemented
TN0212 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $1,503 $498 Implemented
TN0217 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $24,926 $1,300 Implemented
TN0217 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $22,604 $1,425 Implemented
TN0217 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,424 $1,200 Implemented
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
CO0002 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,148 $10,260 Implemented
CO0002 # 03 Y:1984 03 1984 INSTALL STEAM TRAP $1,507 $254 Implemented
CO0002 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,061 $0 Implemented
CO0002 # 07 Y:1984 07 1984 INSTALL TIMERS AND/OR THERMOSTATS $10,932 $1,557 Implemented
CO0003 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,060 $300 Implemented
CO0003 # 02 Y:1984 02 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,272 $2,500 Implemented
CO0003 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $594 $118 Implemented
CO0003 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,430 $500 Implemented
CO0003 # 05 Y:1984 05 1984 INSTALL TURBULATORS $1,594 $1,100 Implemented
CO0003 # 06 Y:1984 06 1984 RECOVER WASTE HEAT FROM EQUIPMENT $435 $800 Implemented
CO0003 # 07 Y:1984 07 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $410 $300 Implemented
CO0003 # 08 Y:1984 08 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $1,765 $1,494 Implemented