IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,751

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0057 # 05 Y:1982 05 1982 CHECK FOR ACCURACY OF UTILITY / POWER METERS $296 $0 Implemented
KU0057 # 06 Y:1982 06 1982 INSTALL AUTOMATIC STACK DAMPER $135 $275 Implemented
KU0057 # 08 Y:1982 08 1982 INSULATE BARE EQUIPMENT $604 $59 Implemented
KU0058 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $14,678 $24,000 Implemented
KU0058 # 07 Y:1982 07 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,260 $600 Implemented
KU0059 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,516 $22,000 Implemented
KU0059 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,363 $120 Implemented
KU0059 # 05 Y:1982 05 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,405 $99 Implemented
KU0060 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $4,740 $1,940 Implemented
UD0041 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $590 Implemented
UD0041 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $420 $0 Implemented
UD0042 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,309 $1,610 Implemented
UD0042 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,870 $1,450 Implemented
UD0042 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,580 $139 Implemented
UD0042 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,997 $0 Implemented
UD0042 # 05 Y:1982 05 1982 REDUCE GLAZED AREAS IN BUILDINGS $1,633 $3,410 Implemented
UD0042 # 06 Y:1982 06 1982 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $866 $4,000 Implemented
UD0043 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $700 Implemented
OK0046 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $148 Implemented
OK0048 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $35 $17 Implemented
OK0051 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $200 Implemented
OK0051 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,675 $3,000 Implemented
OK0051 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $0 Implemented
OK0051 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $13 Implemented
OK0051 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,612 $12,150 Implemented