IAC logo
IAC Assessment: GT0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1985
Principal Product MENS'& BOYS' UNDERWEAR
NAICS n/a
SIC 2254 - Knit Underwear Mills
Sales $10,000,000-$50,000,000
# of Employees 669
Plant Area (Sq.Ft.) 0
Annual Production 12,400,000 Pieces
Production Hrs. Annual 1,960
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,525 4,271,981 kWh $0.06
Natural Gas $62,587 12,923 MMBtu $4.84
Fuel Oil #6 $14,162 2,584 MMBtu $5.48
TOTAL ENERGY COSTS $326,274
RECOMMENDED SAVINGS* $61,334 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,334
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,590
Cost:
$250
$18,590 317,995 - - - - $18,590
317,995
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,568
Cost:
$560
$6,568 112,544 - - - - $6,568
112,544
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.1224 REPLACE BOILER Savings:
$11,945
Cost:
$32,000
- - $9,769 2,078 $2,176 396 -
-
kWh
$9,769
2,078
MMBtu
$2,176
396
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$550
Cost:
$600
$550 9,379 - - - - $550
9,379
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,866
Cost:
-
- - $7,252 1,543 $1,614 294 -
-
kWh
$7,252
1,543
MMBtu
$1,614
294
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,882
Cost:
$2,280
- - $1,542 328 $340 62 -
-
kWh
$1,542
328
MMBtu
$340
62
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$993
Cost:
$894
$993 16,999 - - - - $993
16,999
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,940
Cost:
$15,000
$11,940 - - - - - $11,940
-
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,334
Cost:
$51,584
$38,641 456,917 $18,563 3,949 $4,130 752 $38,641
456,917
kWh
$18,563
3,949
MMBtu
$4,130
752
MMBtu
TOTAL IMPLEMENTED Savings:
$61,334
Cost:
$51,584
$38,641 456,917 $18,563 3,949 $4,130 752 $38,641
456,917
kWh
$18,563
3,949
MMBtu
$4,130
752
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6