IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

346

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0368 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $1,980 Implemented
MI0368 # 07 Y:2020 07 2020 UPGRADE CONTROLS ON COMPRESSORS $1,717 $3,320 Implemented
MI0368 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $2,326 $1,672 Implemented
MI0368 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $3,930 $1,355 Implemented
MI0368 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,279 $10,827 Implemented
MI0368 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $31,298 $16,924 Implemented
MI0360 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $476 $868 Implemented
MI0360 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $751 $211 Implemented
MI0360 # 08 Y:2019 08 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,675 $3,764 Implemented
MI0360 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,445 $1,980 Implemented
MI0360 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $3,023 Implemented
MI0360 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $3,634 Implemented
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
MI0360 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $9,735 $3,600 Implemented
MI0360 # 01 Y:2019 01 2019 USE SOLAR HEAT TO HEAT WATER $36,147 $40,234 Implemented
MI0359 # 13 Y:2019 13 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,546 $480 Implemented
MI0359 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,837 $1,980 Implemented
MI0359 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59,287 $960 Implemented
MI0359 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $182,349 $33,814 Implemented
MI0359 # 02 Y:2019 02 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $281,283 $181,281 Implemented
MI0359 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $547,956 $675,600 Implemented
MI0356 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,569 $2,020 Implemented
MI0356 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,814 $480 Implemented
MI0356 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $10,928 $8,500 Implemented
MI0356 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,615 $19,558 Implemented