IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,681

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0350 # 12 Y:2019 12 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,203 $410 Implemented
MI0350 # 13 Y:2019 13 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,052 $80 Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented
UF0525 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,084 $4,798 Implemented
UF0525 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,145 $3,960 Implemented
UF0525 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,312 $464 Implemented
MI0349 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,314 $3,100 Implemented
MI0349 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,623 $13,592 Implemented
MI0349 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,565 $9,500 Implemented
MI0349 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,966 $2,644 Implemented
MI0349 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $3,414 $972 Implemented
MI0349 # 09 Y:2019 09 2019 USE PHOTOCELL CONTROLS $1,282 $622 Implemented
MI0348 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,411 $167,280 Implemented
MI0348 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,401 $2,020 Implemented
MI0348 # 03 Y:2019 03 2019 UPGRADE OBSOLETE EQUIPMENT $12,811 $30,000 Implemented
MI0348 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,851 $3,229 Implemented
MI0348 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $3,201 $750 Implemented
MI0348 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $7,601 Implemented
MI0348 # 10 Y:2019 10 2019 INSULATE BARE EQUIPMENT $288 $507 Implemented
UF0524 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,330 $139,780 Implemented
UF0524 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,978 $400 Implemented
UF0524 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,897 $0 Implemented
UF0524 # 09 Y:2019 09 2019 TREAT AND REUSE RINSE WATERS $17,615 $0 Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented