IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,351

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0137 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,626 $15,385 Implemented
WM0137 # 05 Y:2019 05 2019 USE RADIANT HEATER FOR SPOT HEATING $2,291 $2,780 Implemented
WM0137 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $629 $1,920 Implemented
IP0120 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,145 $4 Implemented
IP0120 # 02 Y:2019 02 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $835 $0 Implemented
IP0120 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $22 Implemented
IP0120 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $473 $256 Implemented
IP0120 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,019 $4,963 Implemented
IP0120 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $691 $3,215 Implemented
MI0356 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,750 $42,002 Implemented
MI0356 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,615 $19,558 Implemented
MI0356 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $10,928 $8,500 Implemented
MI0356 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,814 $480 Implemented
MI0356 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,569 $2,020 Implemented
MI0355 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $103,161 $14,000 Implemented
MI0355 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,941 $59,135 Implemented
MI0355 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,441 $72,870 Implemented
MI0355 # 09 Y:2019 09 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,604 $2,070 Implemented
UD0999 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,453 $0 Implemented
SF0542 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,762 $0 Implemented
SF0542 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,796 $1,080 Implemented
SF0542 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,409 $1,384 Implemented
SF0542 # 06 Y:2019 06 2019 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $3,054 $9,087 Implemented
SF0542 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,214 $49,905 Implemented
GT0928 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,607 $950 Implemented