IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0302 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,995 $1,466 Implemented
MA0302 # 07 Y:1994 07 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,628 $6,425 Implemented
MA0258 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $1 Implemented
MA0258 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $145 Implemented
MA0233 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,770 $2,000 Implemented
MA0233 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $10,672 $12,412 Implemented
MA0233 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $14,210 Implemented
MA0233 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,334 $8,000 Implemented
MA0233 # 07 Y:1992 07 1992 IMPROVE LUBRICATION PRACTICES $1,170 $0 Implemented
MA0218 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,047 $51,400 Implemented
MA0218 # 02 Y:1991 02 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,649 $15,470 Implemented
MA0218 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,973 $724 Implemented
MA0218 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $1,981 $726 Implemented
MA0218 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $753 $0 Implemented
MA0218 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,262 $15,300 Implemented
MA0210 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $300 $136 Implemented
MA0210 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $191 $350 Implemented
MA0210 # 03 Y:1991 03 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $651 $2,764 Implemented
MA0210 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $47 Implemented
MA0210 # 05 Y:1991 05 1991 DIRECT WARMEST AIR TO COMBUSTION INTAKE $151 $405 Implemented
MA0210 # 06 Y:1991 06 1991 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $1,286 $2,375 Implemented
MA0180 # 01 Y:1990 01 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,523 $5,750 Implemented
MA0180 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,604 $334 Implemented
MA0161 # 01 Y:1989 01 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $335 $703 Implemented
MA0131 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $1,042 Implemented