IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,319

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2312 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,204 $0 Implemented
KS2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $5,480 Implemented
KS2312 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,286 $62,649 Implemented
TR0038 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $921 Implemented
TR0038 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $303 $583 Implemented
TR0038 # 04 Y:2022 04 2022 MAINTAIN MACHINES TO REDUCE LEAKS $717 $884 Implemented
WV0639 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,872 $1,250 Implemented
WV0639 # 05 Y:2023 05 2023 DEVELOP A REPAIR/REPLACE POLICY $11,555 $2,233 Implemented
WV0639 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,297 $100 Implemented
WV0639 # 09 Y:2023 09 2023 INSULATE BARE EQUIPMENT $5,246 $3,107 Implemented
WV0639 # 11 Y:2023 11 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,250 $908 Implemented
WV0639 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $7,083 Implemented
WV0639 # 13 Y:2023 13 2023 INSULATE BARE EQUIPMENT $268 $211 Implemented
AM0876 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,373 $63 Implemented
AM0876 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $20,029 $25,217 Implemented
CM1017 # 01 Y:2023 01 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,638 $57,344 Implemented
CM1017 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $738 $0 Implemented
CM1017 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,890 $15,750 Implemented
CM1017 # 04 Y:2023 04 2023 REPLACE BOILER $20,045 $41,481 Implemented
CM1017 # 05 Y:2023 05 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,538 $4,396 Implemented
CM1017 # 07 Y:2023 07 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,464 $3,500 Implemented
KS2311 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,574 $6,440 Implemented
LE0543 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $839 $100 Implemented
LE0543 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,298 $8,400 Implemented
LE0543 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $210 $760 Implemented