IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0152 # 13 Y:1985 13 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $209 $0 Implemented
KU0154 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $3,000 Implemented
KU0154 # 03 Y:1985 03 1985 INSTALL SET-BACK TIMERS $4,194 $1,052 Implemented
KU0154 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,813 $500 Implemented
KU0154 # 07 Y:1985 07 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $974 $0 Implemented
KU0154 # 08 Y:1985 08 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,887 $1,200 Implemented
KU0154 # 11 Y:1985 11 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $279 $0 Implemented
KU0154 # 12 Y:1985 12 1985 REPAIR AND ELIMINATE STEAM LEAKS $108 $50 Implemented
KU0155 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $948 Implemented
KU0155 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,311 $278 Implemented
KU0155 # 03 Y:1985 03 1985 IMPROVE LUBRICATION PRACTICES $2,931 $0 Implemented
KU0155 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $300 Implemented
KU0155 # 09 Y:1985 09 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,418 $0 Implemented
KU0155 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $827 $300 Implemented
KU0155 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23 $0 Implemented
KU0155 # 15 Y:1985 15 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $393 $0 Implemented
KU0155 # 16 Y:1985 16 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $150 $0 Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented
KU0150 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $749 $200 Implemented
KU0150 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $214 $0 Implemented
KU0150 # 08 Y:1985 08 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $284 $100 Implemented
KU0150 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,016 $131 Implemented