IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,351

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 Implemented
UF0623 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,089 $5,440 Implemented
UF0623 # 04 Y:2024 04 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $2,627 $2,343 Implemented
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 Implemented
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 Implemented
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 Implemented
IC0315 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,959 $820 Implemented
IC0315 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,478 $227 Implemented
IC0315 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $6,223 $2,225 Implemented
IC0315 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,991 $7,497 Implemented
IC0315 # 09 Y:2024 09 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,224 $0 Implemented
WV0674 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,766 $8,674 Implemented
WV0674 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $8,262 Implemented
WV0674 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $696 $1,133 Implemented
WV0674 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $122 Implemented
WV0674 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $225 $88 Implemented
WV0674 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $148 $482 Implemented
UD1095 # 03 Y:2024 03 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,050 $0 Implemented
UD1095 # 02 Y:2024 02 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $581 $10,500 Implemented
UD1094 # 03 Y:2024 03 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $342 $20,000 Implemented
UD1094 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $880 $0 Implemented
WV0670 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $770 Implemented
WV0670 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,211 $1,154 Implemented
WV0670 # 08 Y:2024 08 2024 DEVELOP A REPAIR/REPLACE POLICY $1,123 $1,296 Implemented
WV0670 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $878 $581 Implemented