IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0133 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $113 Implemented
KU0133 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,562 $0 Implemented
KU0133 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $669 $400 Implemented
KU0133 # 15 Y:1984 15 1984 INSULATE BARE EQUIPMENT $626 $450 Implemented
KU0133 # 16 Y:1984 16 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $378 $0 Implemented
KU0133 # 17 Y:1984 17 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $365 $144 Implemented
KU0133 # 18 Y:1984 18 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $245 $250 Implemented
KU0134 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,241 $3,991 Implemented
KU0134 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,694 $3,800 Implemented
KU0134 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,505 $986 Implemented
KU0134 # 07 Y:1984 07 1984 REPAIR AND ELIMINATE STEAM LEAKS $2,701 $0 Implemented
KU0134 # 15 Y:1984 15 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $0 Implemented
KU0134 # 23 Y:1984 23 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $395 $250 Implemented
KU0135 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $9,768 $0 Implemented
KU0135 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $194 $0 Implemented
KU0135 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,716 $2,000 Implemented
KU0135 # 09 Y:1984 09 1984 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $4,203 $100 Implemented
KU0135 # 10 Y:1984 10 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,389 $5,000 Implemented
KU0135 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,886 $78 Implemented
KU0135 # 14 Y:1984 14 1984 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,763 $3,100 Implemented
KU0135 # 19 Y:1984 19 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $905 $300 Implemented
KU0135 # 22 Y:1984 22 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $368 $10 Implemented
KU0136 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,567 $176 Implemented
KU0136 # 14 Y:1984 14 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,003 $215 Implemented
KU0136 # 15 Y:1984 15 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,345 $2,500 Implemented