IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,324

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0015 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,511 $160 Implemented
MU0015 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,565 $40,300 Implemented
MU0015 # 06 Y:2022 06 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $127 $104 Implemented
MU0015 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,257 $5,281 Implemented
MU0015 # 08 Y:2022 08 2022 KEEP EQUIPMENT CLEAN $13 $0 Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
AM0856 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $0 Implemented
AM0856 # 03 Y:2022 03 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,410 $1,000 Implemented
AS0529 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,450,229 $9,600 Implemented
AS0529 # 02 Y:2022 02 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,386,000 $40,297 Implemented
AS0529 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $27,045 $300,000 Implemented
AS0529 # 06 Y:2022 06 2022 Install Anaerobic Digester $232,359 $1,128,000 Implemented
MU0004 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,123 $0 Implemented
MU0004 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,089 $4,922 Implemented
MU0004 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,773 Implemented
MU0004 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $250 $0 Implemented
MU0004 # 06 Y:2022 06 2022 COMBINE UTILITY METERS $180 $0 Implemented
MU0004 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $58 $77 Implemented
NL0072 # 01 Y:2022 01 2022 REPLACE BOILER $18,966 $23,925 Implemented
NL0072 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,761 $20,400 Implemented
NL0072 # 03 Y:2022 03 2022 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $2,055 $266 Implemented
MZ0332 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,571 $18,580 Implemented
MZ0332 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,330 Implemented