IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 12 Y:2016 12 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,996 $0 Implemented
OK0960 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $287 $847 Implemented
OK0960 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $770 $150 Implemented
OK0960 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,672 $13,125 Implemented
OK0957 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,710 $2,100 Implemented
OK0957 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,025 $0 Implemented
OK0957 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,973 $8,747 Implemented
OK0957 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,059 $52,806 Implemented
OK0951 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,904 $3,000 Implemented
OK0951 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,675 $2,816 Implemented
OK0933 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,999 $48,276 Implemented
OK0933 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,290 $20,770 Implemented
OK0933 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,485 $7,280 Implemented
OK0933 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,259 $0 Implemented
OK0933 # 05 Y:2016 05 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $24,062 $20,162 Implemented
OK0933 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,272 $3,404 Implemented
OK0933 # 07 Y:2016 07 2016 REPAIR AND ELIMINATE STEAM LEAKS $353 $240 Implemented
OK0933 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,966 $2,400 Implemented
OK0936 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $46,436 $29,439 Implemented
OK0936 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $323 $450 Implemented
OK0925 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $160 $214 Implemented
OK0925 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,762 $933 Implemented
OK0925 # 06 Y:2015 06 2015 USE COMPRESSOR AIR FILTERS $757 $362 Implemented
OK0925 # 07 Y:2015 07 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $6,933 $5,596 Implemented
OK0932 # 12 Y:2016 12 2016 OPERATE BOILERS ON HIGH FIRE SETTING $16,492 $0 Implemented