Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0680 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,732 | $3,529 | Implemented |
OR0680 # 03 Y:2017 | 03 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,467 | $1,000 | Implemented |
OR0680 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $45,000 | $66,392 | Implemented |
BS0044 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,822 | $2,600 | Implemented |
BS0044 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $338 | $893 | Implemented |
BS0044 # 04 Y:2014 | 04 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $26,828 | $9,000 | Implemented |
BS0044 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,004 | $6,600 | Implemented |
BS0044 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,633 | $872 | Implemented |
BS0044 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,695 | $10,868 | Implemented |
BS0044 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,126 | $1,190 | Implemented |
BS0043 # 03 Y:2014 | 03 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $111,915 | $69,000 | Implemented |
BS0043 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,075 | $429 | Implemented |
BS0043 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,411 | $5,075 | Implemented |
BS0043 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $63,855 | $15,000 | Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS005 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $0 | $490 | Implemented |
ORS005 # 09 Y:1999 | 09 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $310,000 | $69,000 | Implemented |
ORS004 # 01 Y:1999 | 01 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $24,048 | $0 | Implemented |
ORS004 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,758 | $4,840 | Implemented |
ORS004 # 08 Y:1999 | 08 | 1999 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $8,525 | $1,270 | Implemented |
ORS004 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $2,930 | $0 | Implemented |
ORS004 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $14,760 | $6,800 | Implemented |