IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,313

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0579 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,555 $510 Implemented
LE0579 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,704 $2,300 Implemented
LE0579 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,804 $49,222 Implemented
LE0571 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,674 $140 Implemented
LE0571 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $719 $70 Implemented
LE0571 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,911 $1,560 Implemented
LE0571 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
LE0570 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $55,246 $42,000 Implemented
LE0570 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,515 $15,000 Implemented
LE0570 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,252 $5,000 Implemented
LE0570 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,168 $26,500 Implemented
LE0570 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,292 $0 Implemented
LE0570 # 06 Y:2024 06 2024 INSTALL BACK-UP EQUIPMENT $46,731 $90,000 Implemented
LE0562 # 07 Y:2024 07 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,491 $8,000 Implemented
LE0562 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $727 $1,000 Implemented
LE0562 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,612 $350 Implemented
LE0562 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,513 $320 Implemented
LE0555 # 08 Y:2024 08 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $101,613 $202,500 Implemented
LE0555 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $306,071 $500,000 Implemented
LE0555 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $49,962 $35,200 Implemented
LE0555 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,403 $21,160 Implemented
DL0228 # 01 Y:2023 01 2023 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $4,024 $700 Implemented
DL0228 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,279 $0 Implemented
LE0554 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,747 $5,000 Implemented
LE0554 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $873 $2,700 Implemented