Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
848
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2414 # 09 Y:2024 | 09 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $252,286 | $90,000 | Implemented |
UW2414 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $220 | Implemented |
UW2414 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,737 | $25,000 | Implemented |
UW2414 # 11 Y:2024 | 11 | 2024 | USE OTHER METHODS FOR NEUTRALIZATION | $13,133 | $58,000 | Implemented |
UW2414 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $36,181 | $110,000 | Implemented |
UW2414 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $812 | $1,219 | Implemented |
UW2414 # 05 Y:2024 | 05 | 2024 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $57,690 | $7,906 | Implemented |
UW2414 # 02 Y:2024 | 02 | 2024 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $16,683 | $96,069 | Implemented |
UW2414 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $92,758 | $115,000 | Implemented |
UW2414 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,539 | $52,000 | Implemented |
UW2414 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,019 | $162,415 | Implemented |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | Implemented |
UW2413 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $53 | $229 | Implemented |
UW2413 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,582 | $7,250 | Implemented |
UW2413 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,186 | $5,713 | Implemented |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | Implemented |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | Implemented |
UW2412 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,451 | $2,000 | Implemented |
UW2412 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $815 | $4,530 | Implemented |
UW2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,336 | $2,080 | Implemented |
UW2412 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,420 | $1,600 | Implemented |
UW2412 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $6,073 | $3,600 | Implemented |
UW2412 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,736 | $2,075 | Implemented |
UW2412 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,042 | $6,294 | Implemented |
UW2412 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,335 | $0 | Implemented |