Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
768
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2318 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $67 | $180 | Implemented |
UW2318 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $345,363 | $28,215 | Implemented |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | Implemented |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | Implemented |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | Implemented |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | Implemented |
UW2316 # 02 Y:2023 | 02 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,471 | $88,000 | Implemented |
UW2316 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $705 | $2,080 | Implemented |
UW2315 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,189 | $1,896 | Implemented |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $701 | $3,150 | Implemented |
UW2314 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $96 | $180 | Implemented |
UW2313 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $2,813 | $10,637 | Implemented |
UW2313 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $513,763 | $28,215 | Implemented |
UW2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,760 | $2,080 | Implemented |
OR0777 # 02 Y:2023 | 02 | 2023 | INSTALL COMMON HEADER ON COMPRESSORS | $2,832 | $6,989 | Implemented |
OR0777 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,570 | $0 | Implemented |
OR0777 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,479 | $0 | Implemented |
UW2311 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $11,250 | $49,905 | Implemented |
UW2311 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $2,080 | Implemented |
UW2311 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,574 | $693,588 | Implemented |
UW2311 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,668 | $83,148 | Implemented |
UW2311 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,427 | $15,722 | Implemented |
UW2310 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,425 | $1,000 | Implemented |