IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,050

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0149 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,443 $3,262 Implemented
KU0148 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $36 Implemented
KU0148 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $760 $0 Implemented
KU0149 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $3,920 $350 Implemented
CO0015 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $694 $1,127 Implemented
GT0237 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $574 $970 Implemented
KU0148 # 05 Y:1984 05 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $366 $100 Implemented
CO0015 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $50 Implemented
CO0014 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,292 $300 Implemented
KU0148 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,754 $3,000 Implemented
KU0148 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $514 $800 Implemented
CO0015 # 10 Y:1984 10 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,676 $5,000 Implemented
CO0014 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $561 $300 Implemented
CO0014 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,970 $1,000 Implemented
KU0148 # 09 Y:1984 09 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $298 $12 Implemented
GT0237 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,730 $100 Implemented
CO0014 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $74 $135 Implemented
KU0148 # 10 Y:1984 10 1984 REDUCE VENTILATION AIR $2,954 $500 Implemented
CO0015 # 11 Y:1984 11 1984 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $335 $250 Implemented
CO0015 # 06 Y:1984 06 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $791 $230 Implemented
CO0015 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $300 Implemented
KU0148 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $436 $700 Implemented
CO0015 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $963 $908 Implemented
KU0148 # 13 Y:1984 13 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,182 $2,000 Implemented
UD0147 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $588 $680 Implemented