IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,254

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0289 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,373 $4,500 Implemented
TN0289 # 03 Y:1986 03 1986 REPAIR AND ELIMINATE STEAM LEAKS $11,562 $150 Implemented
TN0289 # 04 Y:1986 04 1986 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $143,750 $40,000 Implemented
TN0290 # 01 Y:1986 01 1986 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $8,544 $9,080 Implemented
TN0290 # 02 Y:1986 02 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,673 $3,100 Implemented
TN0290 # 05 Y:1986 05 1986 INSTALL TURBULATORS $469 $500 Implemented
TN0290 # 07 Y:1986 07 1986 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $293 $500 Implemented
TN0291 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,590 $1,809 Implemented
TN0291 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $518 $0 Implemented
TN0291 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $2,828 $4,867 Implemented
TN0291 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $375 Implemented
TN0291 # 07 Y:1986 07 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $295 Implemented
TN0292 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $1,198 $0 Implemented
TN0292 # 04 Y:1986 04 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $206 $175 Implemented
TN0292 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $152 $75 Implemented
AT0051 # 01 Y:1986 01 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $263 $400 Implemented
AT0051 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $55 Implemented
AT0051 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,951 $2,100 Implemented
AT0051 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $0 Implemented
AT0052 # 01 Y:1986 01 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $634 $600 Implemented
AT0052 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,108 $300 Implemented
AT0052 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,478 $713 Implemented
AT0052 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $0 Implemented
AT0053 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,839 $1,967 Implemented
AT0053 # 02 Y:1986 02 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,692 $800 Implemented