IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2206 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,119 $33,560 Not Implemented
UC2206 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,660 $16,842 Not Implemented
UC2206 # 06 Y:2022 06 2022 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,713 $3,300 Not Implemented
UC2206 # 07 Y:2022 07 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $27,967 $231,837 Not Implemented
UC2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $2,641 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented
UC2205 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,990 $500 Not Implemented
UC2205 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,840 $500 Not Implemented
UC2205 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $279,536 $1,875,313 Not Implemented
UC2205 # 06 Y:2022 06 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $65,817 $383,577 Not Implemented
UC2204 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $3,299 $4,273 Not Implemented
UC2204 # 02 Y:2022 02 2022 USE PHOTOCELL CONTROLS $198 $567 Not Implemented
UC2204 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $53,116 $251,956 Not Implemented
UC2204 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $94,985 $434,038 Not Implemented
UC2204 # 05 Y:2022 05 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $29,630 $180,317 Not Implemented
UC2203 # 01 Y:2022 01 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $13,662 $9,582 Not Implemented
UC2203 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $4,020 $7,066 Not Implemented
UC2203 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,091 $2,940 Not Implemented
UC2203 # 04 Y:2022 04 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $22,048 $108,454 Not Implemented
UC2203 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,677 $960 Not Implemented
UC2203 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,588 $4,500 Not Implemented
UC2203 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $806,860 $4,875,813 Not Implemented
UC2202 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,740 $114,471 Implemented
UC2202 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,684 $2,000 Implemented
UC2202 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $960 Not Implemented