Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0546 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,099 | $2,000 | Not Implemented |
LE0546 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,194 | $40,000 | Not Implemented |
LE0546 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $15,770 | $50,000 | Not Implemented |
LE0546 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,440 | $23,030 | Not Implemented |
LE0546 # 09 Y:2023 | 09 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,528 | $27,000 | Not Implemented |
DL0221 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,723 | $0 | Implemented |
DL0221 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $30,683 | $0 | Implemented |
DL0221 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,286 | $3,000 | Not Implemented |
DL0221 # 04 Y:2023 | 04 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $781 | $0 | Implemented |
DL0221 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $740 | $1,500 | Not Implemented |
DL0221 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $293 | $0 | Implemented |
DL0221 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $500 | Implemented |
DL0221 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $75 | $200 | Not Implemented |
DL0221 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $2,678 | $610 | Implemented |
DL0221 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,279 | $1,500 | Not Implemented |
DL0221 # 11 Y:2023 | 11 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $812 | $2,301 | Implemented |
DL0221 # 12 Y:2023 | 12 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,218 | $1,080 | Implemented |
DL0221 # 13 Y:2023 | 13 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $53,076 | $20,000 | Implemented |
DL0221 # 14 Y:2023 | 14 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,645 | $500 | Implemented |
DL0221 # 15 Y:2023 | 15 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,042 | $10,688 | Not Implemented |
DL0221 # 16 Y:2023 | 16 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,688 | $4,615 | Implemented |
WV0640 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,011 | $596 | Implemented |
WV0640 # 01 Y:2023 | 01 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $216,485 | $812,825 | Not Implemented |
WV0640 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,670 | $212,780 | Not Implemented |
WV0640 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $43,563 | $209,750 | Not Implemented |