IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0225 # 07 Y:1994 07 1994 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $290 $0 Implemented
AM0225 # 08 Y:1994 08 1994 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $0 $7,500 Not Implemented
AM0225 # 09 Y:1994 09 1994 MODIFY MATERIAL APPLICATION METHODS $0 $7,500 Implemented
WI0221 # 01 Y:1994 01 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,665 $12,000 Not Implemented
WI0221 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,991 $8,236 Not Implemented
WI0221 # 03 Y:1994 03 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,803 $0 Implemented
WI0221 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,000 Implemented
WI0221 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $640 Implemented
WI0221 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $0 Not Implemented
WI0221 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138 $500 Implemented
UD0447 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $1,018 $1,500 Implemented
UD0447 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,160 $5,000 Not Implemented
UD0447 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,206 $1,000 Implemented
UD0447 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,082 $0 Implemented
UD0447 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,451 $8,620 Implemented
UD0447 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $1,800 Not Implemented
UL0113 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $1,253 Implemented
UL0113 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,294 $1,500 Implemented
UL0113 # 03 Y:1994 03 1994 COVER OPEN TANKS $2,574 $3,994 Implemented
OR0223 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $5,768 Implemented
OR0223 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $4,000 Implemented
OR0223 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $558 $1,345 Implemented
OR0223 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,364 $4,800 Not Implemented
OR0223 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $695 $2,000 Implemented
OR0223 # 06 Y:1994 06 1994 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $23,850 $106,600 Implemented