Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26,104
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0110 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,063 | $4,500 | n/a |
NL0110 # 04 Y:2025 | 04 | 2025 | METER WASTE WATER | $4,494 | $2,400 | n/a |
NL0110 # 05 Y:2025 | 05 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $527 | $700 | n/a |
DL0255 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $3,259 | $5,600 | n/a |
DL0255 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,638 | $17,000 | n/a |
DL0255 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $246,492 | $36,000 | n/a |
DL0255 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,077 | $15,000 | n/a |
DL0255 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,190 | $5,500 | n/a |
DL0255 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,300 | $800 | n/a |
DL0255 # 07 Y:2025 | 07 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,100 | $25,000 | n/a |
DL0255 # 08 Y:2025 | 08 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $76,162 | $42,000 | n/a |
DL0255 # 09 Y:2025 | 09 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,008 | $0 | n/a |
DL0255 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $397 | $55,182 | n/a |
UD1108 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $14,400 | n/a |
UD1108 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,247 | $34,400 | n/a |
UD1108 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $407,706 | $6,324,150 | n/a |
UD1108 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $393 | $8,738 | n/a |
WM0241 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,950 | $0 | n/a |
WM0241 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,959 | $6,000 | n/a |
WM0241 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $2,249 | n/a |
WM0241 # 04 Y:2025 | 04 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $552 | $635 | n/a |
WM0241 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $96 | $368 | n/a |
WV0677 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,491 | $60,024 | n/a |
WV0677 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $15,762 | $7,782 | n/a |
WV0677 # 03 Y:2025 | 03 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $10,271 | $5,515 | n/a |