IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0340 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,786 $1,501 Not Implemented
BD0340 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $381 Not Implemented
BD0340 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,817 $2 Not Implemented
BD0340 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,013 $1,501 Not Implemented
BD0340 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,540 $501 Not Implemented
BD0340 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,077 $2,001 Not Implemented
BD0340 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $8,829 $30,001 Not Implemented
BD0340 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,245 $12,000 Not Implemented
BD0340 # 10 Y:2008 10 2008 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $662,215 $1,001 Not Implemented
BD0339 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $35 Implemented
BD0339 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $221 $75 Not Implemented
BD0339 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $55 $2 Not Implemented
BD0339 # 04 Y:2008 04 2008 USE SYNTHETIC LUBRICANT $116 $76 Implemented
BD0339 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,344 $2,501 Not Implemented
BD0339 # 06 Y:2008 06 2008 INSTALL TURBULATORS $755 $781 Not Implemented
BD0339 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,766 $9,021 Implemented
BD0336 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $106 $151 Not Implemented
BD0336 # 02 Y:2008 02 2008 UPGRADE OBSOLETE EQUIPMENT $226 $2 Not Implemented
BD0336 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $151 Not Implemented
BD0336 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $948 $1,001 Not Implemented
BD0336 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,096 $2,501 Not Implemented
BD0336 # 06 Y:2008 06 2008 INSTALL TURBULATORS $2,117 $2,501 Not Implemented
BD0336 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $558 $151 Implemented
BD0336 # 08 Y:2008 08 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,960 $2 Not Implemented
BD0338 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $1,103 Not Implemented