IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0392 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,192 $0 Implemented
WV0392 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $660 Not Implemented
WV0392 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $416 $283 Implemented
LE0287 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $184,606 $250,000 Not Implemented
LE0287 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $220,823 $50,000 Not Implemented
LE0287 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79,515 $8,000 Not Implemented
LE0287 # 04 Y:2009 04 2009 INSTALL TIMERS AND/OR THERMOSTATS $36,003 $650 Not Implemented
LE0287 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,644 $17,000 Not Implemented
LE0287 # 06 Y:2009 06 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $13,621 $7,167 Not Implemented
LE0287 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $1,840 Implemented
LE0287 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,998 $27,281 Not Implemented
DL0037 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $105,200 $0 Implemented
DL0037 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $644 $140 Implemented
DL0037 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,050 $5,000 Not Implemented
DL0037 # 04 Y:2009 04 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,500 $880 Not Implemented
DL0037 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,330 $8,800 Not Implemented
DL0037 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,254 $35,000 Not Implemented
DL0034 # 01 Y:2009 01 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,400 $3,600 Not Implemented
DL0034 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,702 $5,000 Not Implemented
DL0034 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,700 $4,440 Not Implemented
DL0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,489 $55,984 Implemented
DL0034 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $4,000 Implemented
DL0034 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,735 $18,313 Implemented
DL0034 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $700 $0 Implemented
DL0034 # 08 Y:2009 08 2009 ADD AREA LIGHTING SWITCHES $313 $197 Implemented