Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0343 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,846 | $446 | Implemented |
IA0343 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,120 | $1,866 | Not Implemented |
IA0343 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $125 | $70 | Implemented |
IA0343 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,173 | $7,306 | Implemented |
IA0343 # 05 Y:2004 | 05 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $817 | $1,230 | Not Implemented |
IA0343 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,859 | $9,696 | Not Implemented |
IA0343 # 07 Y:2004 | 07 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,733 | $10,000 | Implemented |
IC0081 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $599 | $0 | Implemented |
IC0081 # 02 Y:2004 | 02 | 2004 | INSTALL SET-BACK TIMERS | $2,895 | $159 | Implemented |
IC0081 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,195 | $600 | Implemented |
IC0081 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $347 | $0 | Implemented |
IC0081 # 05 Y:2004 | 05 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $411 | $2,300 | Not Implemented |
IC0081 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,022 | $22,332 | Not Implemented |
IC0081 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,098 | $23,216 | Not Implemented |
IC0081 # 08 Y:2004 | 08 | 2004 | USE PHOTOCELL CONTROLS | $6,675 | $6,231 | Not Implemented |
IC0081 # 09 Y:2004 | 09 | 2004 | USE PHOTOCELL CONTROLS | $539 | $199 | Not Implemented |
LL0196 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $61,940 | $2,960 | Implemented |
LL0196 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,973 | $1,554 | Implemented |
LL0196 # 03 Y:2004 | 03 | 2004 | USE PHOTOCELL CONTROLS | $12,282 | $798 | Not Implemented |
LL0196 # 04 Y:2004 | 04 | 2004 | USE PHOTOCELL CONTROLS | $3,174 | $783 | Not Implemented |
LL0196 # 05 Y:2004 | 05 | 2004 | USE PHOTOCELL CONTROLS | $3,014 | $651 | Not Implemented |
LL0196 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $529 | $260 | Not Implemented |
LL0196 # 07 Y:2004 | 07 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $345,671 | $400,000 | Not Implemented |
LL0196 # 08 Y:2004 | 08 | 2004 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $199,680 | $390,000 | Implemented |
LL0196 # 09 Y:2004 | 09 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $99,040 | $130,000 | Implemented |