Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,059
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0438 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,793 | $2,800 | Implemented |
WI0438 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $353 | $120 | Implemented |
WI0438 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $261 | $640 | Not Implemented |
WI0437 # 01 Y:2003 | 01 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $72,831 | $56,000 | Not Implemented |
WI0437 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,938 | $72,500 | Not Implemented |
WI0437 # 03 Y:2003 | 03 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $17,126 | $3,000 | Not Implemented |
WI0437 # 04 Y:2003 | 04 | 2003 | INSTALL AUTOMATIC STACK DAMPER | $16,313 | $1,500 | Not Implemented |
WI0437 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,938 | $8,555 | Not Implemented |
WI0436 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,363 | $102,600 | Not Implemented |
WI0436 # 02 Y:2003 | 02 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,768 | $200 | Not Implemented |
WI0436 # 03 Y:2003 | 03 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,276 | $1,424 | Not Implemented |
WI0436 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $861 | $800 | Not Implemented |
WI0436 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $496 | $225 | Not Implemented |
WI0436 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $272 | Not Implemented |
WI0436 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $34 | Implemented |
WI0434 # 01 Y:2002 | 01 | 2002 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $133,384 | $140,000 | Not Implemented |
WI0434 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $9,841 | $25,000 | Not Implemented |
WI0434 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $5,168 | $11,700 | Implemented |
WI0434 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,746 | $12,600 | Not Implemented |
WI0434 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,556 | $740 | Implemented |
WI0434 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $2,832 | Not Implemented |
WI0434 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,191 | $588 | Implemented |
WI0435 # 01 Y:2003 | 01 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $149,500 | $120,000 | Not Implemented |
WI0435 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,988 | $0 | Implemented |
WI0435 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,286 | $10,000 | n/a |