IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26,123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0449 # 04 Y:2018 04 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $298,212 $362,400 Not Implemented
LE0449 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,930 $20,000 Not Implemented
LE0449 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,078 $3,780 Implemented
LE0449 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $913 $2,750 Not Implemented
LE0449 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $4,252 Implemented
LE0449 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,515 $6,962 Implemented
SD0560 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,197 $59,204 Not Implemented
SD0560 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,240 $11,880 Implemented
SD0560 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $19,600 Implemented
SD0560 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,948 $1,200 Implemented
SD0560 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,307 $600 Not Implemented
LS1802 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $379 $0 Implemented
LS1802 # 02 Y:2018 02 2018 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,300 $200 Implemented
LS1802 # 03 Y:2018 03 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $4,166 $2,667 Not Implemented
LS1802 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $427 $400 Implemented
LS1802 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $159 $550 Implemented
UU0128 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $109,419 $1,693 Implemented
UU0128 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $80,946 $500 Implemented
UU0128 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $1,227 $2,200 Implemented
UU0128 # 04 Y:2018 04 2018 DISCONNECT BALLASTS $958 $800 Not Implemented
UU0128 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $829 $0 Implemented
IP0098 # 01 Y:2018 01 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,587 $0 Implemented
IP0098 # 02 Y:2018 02 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,416 $130 Implemented
IP0098 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,663 $115 Implemented
IP0098 # 04 Y:2018 04 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,778 $5,000 Not Implemented