IAC logo
IAC Assessment: MI0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Orthopedic Medical Products
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 85,000
Annual Production 100,000 Pieces
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,479 1,618,125 kWh $0.06
Electricity Demand $62,644 6,321 kW-months/year $9.91
Electricity Fees $19,346 - $ -
TOTAL ENERGY COSTS $186,469
RECOMMENDED SAVINGS* $78,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$21,620
Cost:
$80
- - - - $21,620 - -
-
kWh
-
-
kW-months/year
$21,620
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,939
Cost:
$48,821
$12,160 187,081 $5,779 583 - - $12,160
187,081
kWh
$5,779
583
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$17,738
Cost:
$3,280
$17,738 272,898 - - - - $17,738
272,898
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,664
Cost:
$11,634
$6,018 92,575 $2,646 267 - - $6,018
92,575
kWh
$2,646
267
kW-months/year
-
-
$
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,515
Cost:
$626
$3,732 57,423 $783 79 - - $3,732
57,423
kWh
$783
79
kW-months/year
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,709
Cost:
$2,800
$2,787 42,872 $922 93 - - $2,787
42,872
kWh
$922
93
kW-months/year
-
-
$
07: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$2,620
Cost:
$3,230
$1,470 22,616 $1,150 116 - - $1,470
22,616
kWh
$1,150
116
kW-months/year
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,516
Cost:
$661
$1,050 16,157 $466 47 - - $1,050
16,157
kWh
$466
47
kW-months/year
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$492
Cost:
$1,466
$274 4,210 $218 22 - - $274
4,210
kWh
$218
22
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$78,813
Cost:
$72,598
$45,229 695,832 $11,964 1,207 $21,620 - $45,229
695,832
kWh
$11,964
1,207
kW-months/year
$21,620
-
$
TOTAL IMPLEMENTED Savings:
$70,162
Cost:
$68,081
$38,977 599,636 $9,565 965 $21,620 - $38,977
599,636
kWh
$9,565
965
kW-months/year
$21,620
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes