Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0201 # 04 Y:1997 | 04 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,756 | $26,277 | Not Implemented |
AS0201 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,979 | $34,500 | Not Implemented |
AS0201 # 06 Y:1997 | 06 | 1997 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,153 | $1,070 | Not Implemented |
AS0201 # 07 Y:1997 | 07 | 1997 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $46,235 | $14,000 | Not Implemented |
AS0201 # 08 Y:1997 | 08 | 1997 | INSTALL OCCUPANCY SENSORS | $2,188 | $1,500 | Not Implemented |
AS0201 # 09 Y:1997 | 09 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $600 | Not Implemented |
AS0201 # 10 Y:1997 | 10 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,124 | $35,959 | Not Implemented |
AS0201 # 11 Y:1997 | 11 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,640 | $47,883 | Not Implemented |
AS0201 # 12 Y:1997 | 12 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $830 | $200 | Implemented |
AS0201 # 13 Y:1997 | 13 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $50,790 | $14,000 | Not Implemented |
AS0201 # 14 Y:1997 | 14 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $571,000 | $750,000 | Not Implemented |
AS0201 # 15 Y:1997 | 15 | 1997 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $2,400 | $5,000 | Not Implemented |
AS0200 # 01 Y:1997 | 01 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,061 | $18,500 | Not Implemented |
AS0200 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,941 | $17 | Not Implemented |
AS0200 # 03 Y:1997 | 03 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $1,567 | $1,440 | Implemented |
AS0200 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,154 | $224 | Implemented |
AS0200 # 05 Y:1997 | 05 | 1997 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $464 | $621 | Implemented |
AS0200 # 06 Y:1997 | 06 | 1997 | INSTALL OCCUPANCY SENSORS | $313 | $300 | Not Implemented |
AS0200 # 07 Y:1997 | 07 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,346 | $14,000 | Implemented |
AS0200 # 08 Y:1997 | 08 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,344 | $34 | Not Implemented |
AS0200 # 09 Y:1997 | 09 | 1997 | ELIMINATE SHIFT | $26,201 | $100 | Implemented |
AS0199 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $410 | $0 | Implemented |
AS0199 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,976 | $140 | Implemented |
AS0199 # 03 Y:1997 | 03 | 1997 | USE SYNTHETIC LUBRICANT | $570 | $300 | Not Implemented |
AS0199 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,593 | $12,000 | Not Implemented |