IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0215 # 01 Y:2019 01 2019 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $84,000 $369,200 Not Implemented
TT0215 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,605 $163,091 Not Implemented
TT0215 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $15,764 $1,150 Implemented
TT0215 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $14,409 $72,000 Not Implemented
TT0215 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,811 $5,500 Not Implemented
TT0215 # 06 Y:2019 06 2019 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $9,181 $40,600 Not Implemented
TT0215 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,783 $15,000 Not Implemented
TT0215 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,173 $6,450 Not Implemented
TT0215 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $2,400 $4,140 Not Implemented
MZ0268 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $0 Not Implemented
MZ0268 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $720 Implemented
MZ0268 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102,897 $152,035 Implemented
MZ0268 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $25,560 $24,500 Implemented
MZ0268 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $1,207 $3,830 Not Implemented
MZ0268 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,884 $10,920 Not Implemented
MZ0268 # 07 Y:2019 07 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $375,490 $148,000 Implemented
UU0148 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $4,526,086 $11,242,113 Not Implemented
UU0148 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $292,277 $82,400 Implemented
UU0148 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205,559 $25,240 Implemented
UU0148 # 04 Y:2019 04 2019 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $21,723 $100,000 Not Implemented
UU0148 # 05 Y:2019 05 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,445 $308 Not Implemented
UU0148 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,667 $8,267 Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0525 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,500 $33,800 Not Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented