IAC logo
IAC Assessment: UU0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Phosphate slurry
NAICS 212392 - Phosphate Rock Mining
SIC 1475 - Phosphate Rock
Sales $100,000,000-$500,000,000
# of Employees 160
Plant Area (Sq.Ft.) 50,000
Annual Production 1,530,000 Tons
Production Hrs. Annual 8,160
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,397,205 75,191,029 kWh $0.03
Electricity Demand $1,704,672 126,084 kW-months/year $13.52
Electricity Fees $63,845 - $ -
Natural Gas $26,112 3,264 MMBtu $8.00
TOTAL ENERGY COSTS $4,191,835
RECOMMENDED SAVINGS* $5,062,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $504,504
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Usage Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$4,526,086
Cost:
$11,242,113
$1,171,368 36,720,000 $741,656 54,840 $(-1,139,722) (-425,177) - - - - - - $3,752,784 - $1,171,368
36,720,000
kWh
$741,656
54,840
kW-months/year
$(-1,139,722)
(-425,177)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$3,752,784
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$292,277
Cost:
$82,400
$149,916 - $142,361 10,530 - - - - - - - - - - $149,916
-
kWh
$142,361
10,530
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$205,559
Cost:
$25,240
$38,952 1,221,053 $24,206 1,790 - - $142,402 982,080 - - - - - - $38,952
1,221,053
kWh
$24,206
1,790
kW-months/year
-
-
MMBtu
$142,402
982,080
Tgal
-
-
lb
-
-
$
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$21,723
Cost:
$100,000
$5,940 186,198 $3,703 274 - - - - $7,680 16,000 $4,400 - - - $5,940
186,198
kWh
$3,703
274
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,680
16,000
lb
$4,400
-
$
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$10,445
Cost:
$308
- - - - $10,445 1,306 - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,445
1,306
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,667
Cost:
$8,267
$3,860 120,996 $2,807 208 - - - - - - - - - - $3,860
120,996
kWh
$2,807
208
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$5,062,757
Cost:
$11,458,328
$1,370,035 38,248,247 $914,734 67,642 $(-1,129,277) (-423,871) $142,402 982,080 $7,680 16,000 $4,400 - $3,752,784 - $1,370,035
38,248,247
kWh
$914,734
67,642
kW-months/year
$(-1,129,277)
(-423,871)
MMBtu
$142,402
982,080
Tgal
$7,680
16,000
lb
$4,400
-
$
$3,752,784
-
$
TOTAL IMPLEMENTED Savings:
$504,504
Cost:
$115,907
$192,727 1,342,049 $169,375 12,528 - - $142,402 982,080 - - - - - - $192,727
1,342,049
kWh
$169,375
12,528
kW-months/year
-
-
MMBtu
$142,402
982,080
Tgal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Usage Solid Waste (non-haz) Ancillary Material Cost Primary Product