IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,731

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1001 # 02 Y:2022 02 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,550 $24,900 Not Implemented
CM1001 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $190 $1,100 Implemented
CM1001 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $3,950 Implemented
CM1001 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $1,100 $3,300 Not Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0406 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,016 $100 Not Implemented
MS0396 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $9,487 $17,752 Not Implemented
MS0396 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $295 $0 Implemented
MS0396 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,455 $0 Implemented
MS0396 # 04 Y:2022 04 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $707 $0 Not Implemented
IP0157 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,715 $63 Not Implemented
IP0157 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $2,205 $219 Not Implemented
IP0157 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,303 $702 Not Implemented
IP0157 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $666 $262 Not Implemented
IP0157 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,064 $845 Not Implemented
IP0157 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,143 $2,198 Not Implemented
IP0157 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,072 $6,299 Not Implemented
IP0157 # 08 Y:2022 08 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,868 $7,911 Not Implemented
IP0157 # 09 Y:2022 09 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,808 $16,500 Not Implemented
MUCM01 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $16,827 $0 Implemented