IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0381 # 14 Y:2014 14 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,535 $51,625 Not Implemented
AM0657 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,150 $16,680 Implemented
AM0657 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,770 $21,200 Not Implemented
AM0657 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $4,420 $450 Not Implemented
AM0657 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,540 $0 Implemented
AM0657 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $330 Implemented
UD0902 # 01 Y:2014 01 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,267 $0 Not Implemented
UD0902 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,433 $1,000 Implemented
UD0902 # 03 Y:2014 03 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $828 $0 Not Implemented
UD0902 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $671 $6,000 Implemented
UD0902 # 05 Y:2014 05 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,766 $0 Not Implemented
UD0902 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,717 $0 Not Implemented
UD0902 # 07 Y:2014 07 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $0 Not Implemented
UD0902 # 08 Y:2014 08 2014 COMBINE UTILITY METERS $5,096 $0 Not Implemented
UD0902 # 09 Y:2014 09 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $9,848 $0 Not Implemented
UD0902 # 10 Y:2014 10 2014 INSULATE BARE EQUIPMENT $348 $0 Not Implemented
TT0130 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $29,307 $44,000 Implemented
TT0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,560 $12,150 Implemented
TT0130 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,677 $4,500 Implemented
TT0130 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,047 $3,000 Not Implemented
TT0130 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,989 $20,000 Implemented
TT0130 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,191 $6,041 Implemented
UA0120 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,979 $24,613 Implemented
UM0444 # 01 Y:2014 01 2014 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $216,000 $500,000 Not Implemented
UM0444 # 02 Y:2014 02 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $71,820 $133,000 Not Implemented