Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0197 # 03 Y:1997 | 03 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,704 | $21,700 | Implemented |
AS0197 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,699 | $3,600 | Not Implemented |
AS0197 # 05 Y:1997 | 05 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $319 | $0 | Implemented |
AS0197 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $779 | $1,680 | Implemented |
AS0197 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,006 | $180 | Implemented |
AS0197 # 08 Y:1997 | 08 | 1997 | INSTALL OCCUPANCY SENSORS | $5,740 | $12,300 | Not Implemented |
AS0197 # 09 Y:1997 | 09 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,494 | $13,387 | Implemented |
AS0197 # 10 Y:1997 | 10 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $1,093 | $779 | Not Implemented |
AS0197 # 11 Y:1997 | 11 | 1997 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $17,366 | $4,500 | Not Implemented |
AS0197 # 12 Y:1997 | 12 | 1997 | PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS | $58,584 | $15,000 | Not Implemented |
AS0197 # 13 Y:1997 | 13 | 1997 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $1,460 | $50 | Implemented |
AS0196 # 01 Y:1997 | 01 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,135 | $0 | Not Implemented |
AS0196 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,489 | $120 | Implemented |
AS0196 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,559 | $3,945 | Implemented |
AS0196 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,068 | $2,154 | Not Implemented |
AS0196 # 05 Y:1997 | 05 | 1997 | INSTALL OCCUPANCY SENSORS | $885 | $675 | Implemented |
AS0196 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $73 | $194 | Implemented |
AS0196 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $422 | $0 | Not Implemented |
AS0196 # 08 Y:1997 | 08 | 1997 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $4,589 | $1,300 | Implemented |
AS0196 # 09 Y:1997 | 09 | 1997 | CLEAR AND RENT EXISTING SPACE | $9,660 | $10,000 | Not Implemented |
AS0195 # 01 Y:1996 | 01 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,771 | $38,500 | Not Implemented |
AS0195 # 02 Y:1996 | 02 | 1996 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,617 | $13,200 | Implemented |
AS0195 # 03 Y:1996 | 03 | 1996 | INSTALL OCCUPANCY SENSORS | $872 | $975 | Implemented |
AS0195 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,057 | $1,120 | Implemented |
AS0195 # 05 Y:1996 | 05 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,337 | $0 | Implemented |