IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0092 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $364 n/a
MS0092 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $4,351 n/a
MS0092 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $19,015 $33,000 n/a
MS0092 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,493 $0 n/a
MS0092 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $7,975 $10,000 n/a
MS0092 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,093 $0 n/a
WI0301 # 01 Y:1997 01 1997 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,464 $13,000 Not Implemented
WI0301 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,129 $500 Not Implemented
WI0301 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $10,763 $23,000 Implemented
WI0301 # 04 Y:1997 04 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,590 $1,000 Not Implemented
WI0301 # 05 Y:1997 05 1997 TREAT AND REUSE RINSE WATERS $3,396 $1,735 Not Implemented
WI0301 # 06 Y:1997 06 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $793 $0 Not Implemented
WI0301 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $768 $998 Implemented
WI0301 # 08 Y:1997 08 1997 REDUCE VENTILATION AIR $346 $1,000 Not Implemented
WI0301 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $170 $300 Not Implemented
SD0179 # 01 Y:1997 01 1997 REPLACE BOILER $8,920 $15,000 Implemented
SD0179 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,564 $350 Implemented
SD0179 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,715 $11,208 Implemented
SD0179 # 04 Y:1997 04 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $4,501 $3,940 Implemented
SD0179 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,200 $9,000 Implemented
SD0179 # 06 Y:1997 06 1997 RECOVER AND REUSE WASTE MATERIAL $2,550 $0 Implemented
SD0179 # 07 Y:1997 07 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $10,940 $0 Not Implemented
SD0179 # 08 Y:1997 08 1997 WASH AND REUSE RAGS ON-SITE $11,710 $1,000 Implemented
SD0179 # 09 Y:1997 09 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,500 $5,000 Implemented
SD0179 # 10 Y:1997 10 1997 MODIFY CURRENT INCENTIVE PROGRAM $575,838 $120,000 Not Implemented