IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0493 # 03 Y:2005 03 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $22,020 $0 Not Implemented
WI0493 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,731 $1,920 Not Implemented
WI0493 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,287 $1,300 Not Implemented
WI0493 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $2,000 Not Implemented
OK0708 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $6,087 Implemented
OK0708 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $6,700 Implemented
OK0708 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $1,327 Implemented
OK0708 # 04 Y:2005 04 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $0 Not Implemented
OK0708 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $37,832 $13,050 Implemented
OK0708 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,450 $26,280 Implemented
OK0708 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,070 $700 Implemented
SU0210 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,587 $0 Implemented
SU0210 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,063 $0 Not Implemented
SU0210 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $143 Implemented
SU0210 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,943 $1,000 Implemented
SU0210 # 05 Y:2005 05 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $28,070 $35,100 Implemented
SU0210 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,715 $11,225 Not Implemented
TA0096 # 01 Y:2005 01 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,200 $25,840 Not Implemented
TA0096 # 02 Y:2005 02 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,700 $5,330 Not Implemented
TA0096 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $11,500 $2,340 Not Implemented
TA0096 # 04 Y:2005 04 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,870 $13,400 Not Implemented
TA0096 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,525 $7,400 Not Implemented
TA0096 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $500 Implemented
TA0096 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $0 Not Implemented
TA0096 # 08 Y:2005 08 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $645 $0 Not Implemented