IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0362 # 03 Y:2008 03 2008 ADD AREA LIGHTING SWITCHES $1,517 $312 Implemented
SF0362 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,745 $1,291 Implemented
SF0362 # 05 Y:2008 05 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,707 $15,056 Implemented
SF0362 # 06 Y:2008 06 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,910 $7,463 Not Implemented
SF0362 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $12,488 $14,628 Not Implemented
SF0362 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,951 $11,120 Not Implemented
SF0362 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $488 $1,566 Implemented
SF0366 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,775 $0 Implemented
SF0366 # 02 Y:2008 02 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,455 $452 Not Implemented
SF0366 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,202 $1,339 Implemented
SF0366 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $93 Implemented
SF0366 # 05 Y:2008 05 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,839 $2,119 Not Implemented
SF0366 # 06 Y:2008 06 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,476 $2,404 Implemented
SF0366 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,134 $4,709 Not Implemented
SF0366 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $2,892 Not Implemented
SF0366 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $953 Implemented
UD0783 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $26,465 $0 Not Implemented
UD0783 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,926 $27,004 Not Implemented
UD0783 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $23,572 $65,625 Not Implemented
UD0783 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $15,545 $10,000 Not Implemented
UD0783 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $7,231 $7,200 Not Implemented
UD0783 # 06 Y:2008 06 2008 INSTALL SKYLIGHTS $6,996 $40,770 Not Implemented
UD0783 # 07 Y:2008 07 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,745 $0 Not Implemented
UD0783 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,324 $0 Not Implemented
UD0783 # 09 Y:2008 09 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,818 $5,000 Not Implemented