Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0401 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,792 | $7,958 | Implemented |
WV0401 # 06 Y:2010 | 06 | 2010 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,226 | $20,400 | Implemented |
WV0401 # 07 Y:2010 | 07 | 2010 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $7,432 | $16,240 | Not Implemented |
WV0401 # 08 Y:2010 | 08 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,432 | $2,028 | Implemented |
WV0401 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,622 | $312 | Implemented |
WV0401 # 10 Y:2010 | 10 | 2010 | IMPROVE LUBRICATION PRACTICES | $3,683 | $858 | Not Implemented |
WV0401 # 11 Y:2010 | 11 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,378 | $936 | Not Implemented |
WV0401 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,182 | $2,886 | Implemented |
WV0401 # 13 Y:2010 | 13 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,239 | $1,000 | Implemented |
WV0401 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $536 | $52 | Implemented |
MI0188 # 01 Y:2010 | 01 | 2010 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $500,499 | $0 | Implemented |
MI0188 # 02 Y:2010 | 02 | 2010 | USE POWER DURING OFF-PEAK PERIODS | $45,276 | $2,000 | Not Implemented |
MI0188 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $42,782 | $60 | Implemented |
MI0188 # 04 Y:2010 | 04 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $38,905 | $0 | Not Implemented |
MI0188 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,420 | $920 | Implemented |
MI0188 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,600 | $1,920 | Implemented |
MI0188 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,952 | $3,680 | Not Implemented |
MI0188 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,050 | $2,904 | Implemented |
MI0188 # 09 Y:2010 | 09 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,341 | $1,800 | Implemented |
MI0188 # 10 Y:2010 | 10 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,536 | $1,500 | Implemented |
MS0351 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $104,520 | $29,318 | Not Implemented |
MS0351 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $80,833 | $872 | Implemented |
MS0351 # 03 Y:2010 | 03 | 2010 | PAY UTILITY BILLS ON TIME | $36,706 | $0 | Implemented |
MS0351 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,587 | $322 | Implemented |
MS0351 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,134 | $210 | Not Implemented |