Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0479 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,268 | $549 | Implemented |
IA0479 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $447 | $752 | Not Implemented |
IA0479 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,057 | $158 | Implemented |
IA0479 # 05 Y:2012 | 05 | 2012 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $400 | $1,030 | Not Implemented |
IA0479 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $655 | $3,430 | Not Implemented |
IA0479 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,014 | $250 | Not Implemented |
IA0479 # 08 Y:2012 | 08 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $234 | $240 | Not Implemented |
TT0088 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $192 | $25 | Not Implemented |
TT0088 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,465 | $3,978 | Not Implemented |
TT0088 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,506 | $5,300 | Not Implemented |
TT0088 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $850 | Not Implemented |
TT0088 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,989 | $10,200 | Not Implemented |
TT0088 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $11,880 | Not Implemented |
TT0088 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $3,350 | Not Implemented |
TT0088 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77 | $1,014 | Not Implemented |
TT0088 # 09 Y:2012 | 09 | 2012 | METER WASTE WATER | $3,603 | $750 | Not Implemented |
TT0088 # 10 Y:2012 | 10 | 2012 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $19,167 | $47,935 | Not Implemented |
SD0450 # 01 Y:2012 | 01 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $8,111 | $200 | Not Implemented |
SD0450 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,795 | $200 | Not Implemented |
SD0450 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,833 | $1,900 | Not Implemented |
SD0450 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $1,297 | $3,550 | Not Implemented |
SD0450 # 05 Y:2012 | 05 | 2012 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,500 | $25,000 | Not Implemented |
MZ0083 # 01 Y:2012 | 01 | 2012 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $2,727 | $16,800 | Not Implemented |
MZ0083 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,272 | $900 | Implemented |
MZ0083 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,851 | $0 | Not Implemented |