IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0410 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,702 $18,890 Implemented
SU0410 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,321 $35,838 Implemented
SU0410 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $145 $265 Implemented
SU0410 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $956 Implemented
AM0704 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,006 $0 Implemented
AM0704 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $101,844 $0 Implemented
AM0704 # 03 Y:2016 03 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $32,650 $9,000 Implemented
AM0704 # 04 Y:2016 04 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $91,870 $0 Implemented
AM0704 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $23,510 $20,730 Implemented
AM0704 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,685 $28,500 Implemented
AM0704 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,750 $5,000 Implemented
AM0704 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,395 $30 Not Implemented
AM0704 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $3,375 $0 Implemented
AM0704 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,510 $0 Implemented
AM0704 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $2,440 $650 Implemented
AM0704 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $918 $3,100 Implemented
AM0704 # 13 Y:2016 13 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Not Implemented
IP0062 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $13,450 $7 Implemented
IP0062 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $22 Implemented
IP0062 # 03 Y:2016 03 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $605 $0 Not Implemented
IP0062 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $19,981 $2,354 Not Implemented
IP0062 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,081 $4,092 Not Implemented
IP0062 # 06 Y:2016 06 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $1,743 $2,278 Not Implemented
IP0062 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,609 $12,262 Not Implemented
LE0415 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $958 $25 Implemented