Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,910
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0020 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $178 | $770 | n/a |
SJ0020 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $0 | n/a |
SJ0020 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,851 | $0 | n/a |
SJ0020 # 07 Y:2024 | 07 | 2024 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,380 | $0 | n/a |
SJ0020 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,868 | $15,989 | n/a |
MZ1006 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $1,443 | $750 | Implemented |
MZ1006 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,865 | $676 | Implemented |
MZ1006 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $803 | $0 | Not Implemented |
MZ1006 # 04 Y:2024 | 04 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,976 | $42,025 | Not Implemented |
MZ1006 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,918 | $292,501 | Not Implemented |
MI0443 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,913 | $0 | Not Implemented |
MI0443 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,162 | $54,938 | Implemented |
MI0443 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,706 | $1,980 | Not Implemented |
MI0443 # 04 Y:2024 | 04 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $7,616 | $18,760 | Not Implemented |
MI0443 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,571 | $14,916 | Implemented |
MI0443 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO HEAT WATER | $4,071 | $12,390 | Not Implemented |
MI0443 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,482 | $240 | Implemented |
MI0443 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $1,287 | $501 | Implemented |
LE0571 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $737 | $0 | Implemented |
LE0571 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,674 | $140 | Implemented |
LE0571 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $719 | $70 | Implemented |
LE0571 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,911 | $1,560 | Implemented |
LE0571 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,724 | $80,063 | Not Implemented |
LE0571 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $97,059 | $323,310 | Not Implemented |
LE0571 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,515 | $9,473 | Not Implemented |