IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,910

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0020 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $178 $770 n/a
SJ0020 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $0 n/a
SJ0020 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,851 $0 n/a
SJ0020 # 07 Y:2024 07 2024 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,380 $0 n/a
SJ0020 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,868 $15,989 n/a
MZ1006 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,443 $750 Implemented
MZ1006 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,865 $676 Implemented
MZ1006 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $803 $0 Not Implemented
MZ1006 # 04 Y:2024 04 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,976 $42,025 Not Implemented
MZ1006 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $40,918 $292,501 Not Implemented
MI0443 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,913 $0 Not Implemented
MI0443 # 02 Y:2024 02 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,162 $54,938 Implemented
MI0443 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,706 $1,980 Not Implemented
MI0443 # 04 Y:2024 04 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,616 $18,760 Not Implemented
MI0443 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,571 $14,916 Implemented
MI0443 # 06 Y:2024 06 2024 USE SOLAR HEAT TO HEAT WATER $4,071 $12,390 Not Implemented
MI0443 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,482 $240 Implemented
MI0443 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,287 $501 Implemented
LE0571 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
LE0571 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,674 $140 Implemented
LE0571 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $719 $70 Implemented
LE0571 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,911 $1,560 Implemented
LE0571 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,724 $80,063 Not Implemented
LE0571 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $97,059 $323,310 Not Implemented
LE0571 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,515 $9,473 Not Implemented