Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |
MI0224 # 06 Y:2012 | 06 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $996 | $2,594 | Implemented |
MI0224 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $1,962 | $520 | Implemented |
MI0224 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,668 | $80 | Implemented |
MI0224 # 09 Y:2012 | 09 | 2012 | INSTALL SKYLIGHTS | $1,608 | $5,550 | Not Implemented |
MI0224 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,230 | Implemented |
MI0223 # 01 Y:2012 | 01 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $40,345 | $71,843 | Not Implemented |
MI0223 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,827 | $10,160 | Not Implemented |
MI0223 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,776 | $14,480 | Not Implemented |
MI0223 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,207 | $2,520 | Implemented |
MI0223 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |
MI0223 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,824 | $4,510 | Implemented |
MI0223 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,438 | $1,660 | Not Implemented |
MI0223 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,364 | $5,920 | Not Implemented |
MI0223 # 09 Y:2012 | 09 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,345 | $80 | Not Implemented |
MI0223 # 10 Y:2012 | 10 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,496 | $1,800 | Implemented |
MI0223 # 11 Y:2012 | 11 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $401 | $1,103 | Implemented |
MI0221 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,726 | $1,800 | Implemented |
MI0221 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,561 | $1,660 | Implemented |
MI0221 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,281 | $11,600 | Implemented |
MI0221 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,238 | $80 | Implemented |
MI0221 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,133 | $5,826 | Not Implemented |
MI0221 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $1,075 | Implemented |
MI0221 # 07 Y:2012 | 07 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,296 | $2,784 | Not Implemented |