IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0108 # 01 Y:1987 01 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,044 $0 Implemented
MA0108 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $4,311 $9,576 Not Implemented
MA0108 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,645 $387 Implemented
MA0108 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,121 $12,244 Implemented
MA0108 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $39,146 $80,000 Implemented
MA0108 # 06 Y:1987 06 1987 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,043 $1,235 Not Implemented
MA0108 # 07 Y:1987 07 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,195 $340 Not Implemented
MA0097 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $108 $86 Not Implemented
MA0097 # 02 Y:1987 02 1987 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,263 $12,000 Not Implemented
MA0097 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $922 $876 Not Implemented
MA0097 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $1,086 $851 Not Implemented
MA0097 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,363 $5,500 Not Implemented
MA0097 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $349 $2,167 Not Implemented
MA0097 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,283 $0 Not Implemented
MA0097 # 08 Y:1987 08 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,545 $6,000 Not Implemented
MA0099 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $500 Implemented
MA0099 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Implemented
MA0099 # 03 Y:1987 03 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,540 $30,000 Not Implemented
MA0099 # 04 Y:1987 04 1987 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $664 $800 Implemented
MA0100 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,258 $2,050 Implemented
MA0100 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,571 $19,480 Not Implemented
MA0100 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $200 Implemented
MA0101 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,063 $3,477 Not Implemented
MA0101 # 02 Y:1987 02 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $781 $0 Not Implemented
MA0101 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,436 $1,000 Not Implemented