IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0156 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,188 $5,007 Not Implemented
IP0156 # 05 Y:2022 05 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,101 $4,200 Implemented
WM0178 # 01 Y:2022 01 2022 USE SYNTHETIC LUBRICANT $4,241 $8,000 Not Implemented
WM0178 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $2,564 Implemented
WM0178 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $189 $0 Implemented
WM0178 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $154 $0 Implemented
WM0178 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $139 $0 Implemented
WM0178 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $120 $500 Not Implemented
MU0001 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,472 $0 Not Implemented
MU0001 # 02 Y:2022 02 2022 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,156 $3,960 Implemented
MU0001 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,694 $600 Implemented
MU0001 # 04 Y:2022 04 2022 OPERATE BOILERS ON HIGH FIRE SETTING $2,532 $146 Implemented
MU0001 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,097 $16,000 Not Implemented
MU0001 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $228 $0 Implemented
OR0753 # 01 Y:2022 01 2022 MODIFY CURRENT INCENTIVE PROGRAM $1,000 $0 Not Implemented
OR0753 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,938 $40,624 Not Implemented
OR0753 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $14,927 $278,534 Not Implemented
LS1022 # 01 Y:2022 01 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,456 $0 Implemented
LS1022 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,565 $88 Implemented
LS1022 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $270 Implemented
LS1022 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $248 $50 Implemented
LS1022 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,202 $12,065 Implemented
LS1022 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,544 $66,750 Implemented
LS1022 # 07 Y:2022 07 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,344 $218,400 Implemented
LS1022 # 08 Y:2022 08 2022 REPLACE BOILER $186,054 $504,000 Implemented