IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0881 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $50 Implemented
UD0881 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $371 $1,000 Not Implemented
UD0881 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $15,000 Implemented
UD0881 # 11 Y:2013 11 2013 USE MINIMUM STEAM OPERATING PRESSURE $184 $200 Implemented
UD0881 # 12 Y:2013 12 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $133 $100 Implemented
UD0881 # 13 Y:2013 13 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,343 $55,500 Not Implemented
UD0881 # 14 Y:2013 14 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,378 $11,500 Not Implemented
UD0881 # 15 Y:2013 15 2013 COVER OPEN TANKS $3,707 $3,174 Not Implemented
UD0881 # 16 Y:2013 16 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $24,715 $101,000 Not Implemented
WV0470 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,095 $2,500 Implemented
WV0470 # 02 Y:2013 02 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $16,582 $68,000 Implemented
WV0470 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,807 $20,200 Not Implemented
WV0470 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,666 $1,080 Implemented
WV0470 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,422 $13,020 Not Implemented
WV0470 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,069 $2,050 Implemented
WV0470 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,736 $1,700 Implemented
WV0470 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,892 $3,300 Not Implemented
WV0470 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $105 Implemented
WV0470 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $152 $380 Not Implemented
WV0469 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $21,317 $6,300 Not Implemented
WV0469 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,090 $1,989 Implemented
WV0469 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,896 $10,694 Not Implemented
WV0469 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,996 $0 Implemented
WV0469 # 05 Y:2013 05 2013 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,853 $5,700 Not Implemented
WV0469 # 06 Y:2013 06 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,514 $1,000 Implemented