IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0739 # 01 Y:2006 01 2006 CHANGE OPERATING CONDITIONS $41,626 $4,000 Implemented
UD0739 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $11,417 $3,300 Not Implemented
UD0739 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,822 $23,400 Not Implemented
UD0739 # 04 Y:2006 04 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,397 $0 Implemented
UD0739 # 05 Y:2006 05 2006 CONDENSE OPERATION INTO ONE BUILDING $1,391 $30 Implemented
UD0739 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $1,049 $387 Implemented
UD0739 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $873 $1,900 Not Implemented
UD0739 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $0 Implemented
UD0739 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $539 $540 Not Implemented
UD0739 # 10 Y:2006 10 2006 SHUT OFF PILOTS IN STANDBY EQUIPMENT $109 $0 Implemented
UD0739 # 11 Y:2006 11 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $104 $0 Implemented
MA0603 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $715,984 $3,400,000 Not Implemented
MA0603 # 02 Y:2006 02 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $54,146 $2,000 Implemented
MA0603 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,920 $83,405 Implemented
MA0603 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,778 $8,125 Implemented
MA0603 # 05 Y:2006 05 2006 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $26,243 $30,600 Not Implemented
MA0603 # 06 Y:2006 06 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $24,068 $0 Not Implemented
MA0603 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,595 $83,500 Implemented
MA0603 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,480 $50,000 Implemented
MA0603 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,490 $6,000 Not Implemented
MA0603 # 10 Y:2006 10 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,287 $0 Implemented
MA0603 # 11 Y:2006 11 2006 BURN WASTE OIL FOR HEAT $3,685 $6,500 Implemented
MA0603 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,508 $10,500 Not Implemented
MA0603 # 13 Y:2006 13 2006 REPAIR OR REPLACE STEAM TRAPS $2,847 $1,600 Not Implemented
MA0603 # 14 Y:2006 14 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,402 $0 Implemented